Benaki Museum Shading System


Info
  • Client: BIOTER
  • 2004-08-01
  • Athens, Attica

Technical Information

  • Main material: Stainless steel
  • Construction length: 72m
  • Construction height: 12m
  • Construction weight: 35 tons
  • Louvers: 628 pcs
  • Adjustable angle  

The construction and installation of the automated shading stainless louvers sysystem, on the patio of the Cultural Centre Benaki Museum took place in August 2004.